Assistance to the safe and secure operation of the plant through preventive & corrective maintenance, perform management of changes, update & patch management, alert & response management, backup & restore, and audit for compliance during the entire lifecycle of the IACS/SUC to keep below the tolerable risk.
This program has been designed and developed by WisePlant Group in cooperation with ARPEL, specially tailored (but not limited to) companies in the energy, oil and gas sector. Visit ARPEL to know more about the organization.
Contents of EN62 course
View or download the EN60 Course datasheet here.

Once all the intolerable risks are mitigated, the intolerable potential consequences should not be able from happening because of cyber causes. Even though, cyber-incident may still happen. The three layers (Governance, Systems, Plant) are rock solid.
At this stage in the process, we have built a solid foundation for cybersecurity. The plant can continue to be operated below the tolerable risk. While the plant is already resilient to any type of threat, including those persistent attacks, it is crucial for every plant to maintain a safe and secure operation.
Build meaningful dashboards for continuous improvement, since there will always be an opportunity for improvement. Maintain a strong culture of security and safety for the rest of life of the systems and the plant. Feel confident that its life has been extended.

Operate confidently by implementing strategies and maintaining vigilant systems for monitoring, detection, alerts, and response plan management assertively without false positives. Integrate with corporate SOC-OT applications for bidirectional exchange of security information.
Design and implement industrial systems update strategies appropriately with peace of mind. Design and implement update management processes in industrial systems, maintaining security levels without degrading. Even a small change can affect the plant. Updates are not urgent anymore, since the risk is already mitigated and potential consequences should not be able to happen.
Every time that a change into the SuC or AuC is required, reassess the involved zones and conduits to review the SLT and the recommendations. Make sure that those change does not create an opportunity for insecure operation.
Execute preventive maintenance activities on industrial systems for the security of zones and conduits and plant safety. Design and manage backup plans and systems and recovery plans. Develop periodic security audits on industrial systems in zones and conduits.
The multiple systems under consideration (SuC) are ready to be certified as well as the CSMP (Cyber Security Management Program), if this is a requirement of the plant. Keep all evidence from early activities secured and updated to be shown to the certification authority at a later time.
Characteristics of this event ID#55774
- Language: English.
- Duration: around 10 to 12 hours, depending on student pace.
- Modality: virtual online self-paced with SME coaching as needed.
- Study and supplementary material.
- Eligible to take the certification exam in English.
- Join study and experience groups.
Crash Course, Practical and Effective!
To ensure an adequate and maximum transfer of knowledge, it is necessary to access certified instructors who have the extensive knowledge and experience, making good use of international standards, regulations, and without vices.
One of the most important objectives to be achieved by the attendees at EN62, is to ensure a safe operation of the plant, execute preventive and corrective maintenance, respond to alerts, and audit for compliance. This is the largest phase in the cybersecurity lifecycle.
You will learn a proven practical methodology to fully comply with ISA/IEC-62443 series of standards and harmonize with popular regulations with easy, and no hassle, that everyone can understand and follow. This course will be held entirely, virtually prerecorded for on-demand, in English at the student own pace.
The course slides and recordings will be available in English within the educational platform. Participants will have access to the course material for an indefinite period of time (minimum one year) with access to a wealth of complementary information.
At the end of the course and as a last activity, the participants will individually carry out an evaluation to obtain the corresponding certificate.
Modality and Schedules
After processing the subscription, the participants will receive the Syllabus by email and additional timely instructions.
A Q&A session to participate in group with the instructor is available. You can also request one-to-one sessions with the instructor to receive personal professional guidance at no additional charge, even after the training event period has ended.
On-Demand with audio and video on the WiseCourses Academic Campus. It contains a practice exam at the end of the training event that will be taken online within our Educational Campus.
The training material is not downloadable. Access to the training material is granted for one year, which can be extended upon request.
Participants must have at least one computer and Internet access with a good quality connection (a bandwidth of at least 1 MB). Important: While, the training event takes place within a certain period of time, the student can complete the training before or after the specific period.
Group sessions and chat assistance would not be available outside the specified period. Students are required to complete all course sections to participate in the evaluation and thus obtain the corresponding Certificate.
While we encourage to complete the training activity with the specified period, the participants will still be able to complete the training event with no limitations.
Professional Certification
All participants who have satisfactorily completed 100% of the EN62 course objectives will be eligible to take the internationally valid EN62 certification exam. Students who have successfully completed the course will be able to take the exam and thus obtain their professional certification.
About the Instructor: Max Kon
Maximillian G. Kon is an engineer in electronics with specialization in telecommunications, industrial automation, and cybersecurity. Co-author of ISA Certificate program (IC32, IC33, IC34, IC37), current official instructor of ISA Training, and CEO of WisePlant Group LLC. He joined the ISA99 committee in 2006 as an SME. Max shares a proven methodology and lots of experience in helping large multinational organizations to protect what really matters.