Loading Events

« All Events

Oct 7

EN60: Cyber ​​risk assessment in new and existing industrial systems in energy, oil, and gas. (ID#55770)

October 7, 2024 - December 31, 2026

$650,00 – $950,00
EN60 ID 55770

Tickets

The numbers below include tickets for this event already in your cart. Clicking "Get Tickets" will allow you to edit any existing attendee information as well as change ticket quantities.
EN60 #55770 x ARPEL Member
The price is valid for a single participant. You will need to verify ARPEL membership.
$650,00
Unlimited
EN60 #55770 x No Member
The price is valid for a single participant.
$950,00
Unlimited

Perform industrial cybersecurity risk assessment to protect all receivers of risk and build a Secure By Design infrastructure, resilient to any type of threat, even if the cyber-incidents finally happens.

This program has been designed and developed by WisePlant Group in cooperation with ARPEL, specially tailored (but not limited to) companies in the energy, oil and gas sector. Visit ARPEL to know more about the organization.

Summary of Contents

View or download the EN60 Course datasheet here.

EN60 Assess Phase

Learn a practical methodology to go through a decision-taking process for identifying and mitigating all intolerable risk. From small to large and very large systems. From new and future systems that yet does not exist to already running legacy dinosaurs.

The well documented WBS methodology for assessing the industrial cybersecurity risk will allow Asset Owners to influence the design of the Systems under Consideration (SuC) and the design of the plant (Assets under Consideration, AuC) for preventing consequences for happening.

Learn how to harmonize ISA/IEC-62443 with popular regulations (NIST, NERC, TSA …) from the beginning of the development making sure that the multidisciplinary team is going to take and best and most beneficial decisions for the plant, and the life of the company.

Maximize the Return On the Investment (ROI) in OT by taking the best decisions, at a minimal cost, with the longest durable time and by extending the life of the system and the life of the plant.

Develop clarity about the deliverables to be produced at the end of each of the activities. Develop all activities successfully, making optimal use of resources and time.

Correctly identify the system under consideration, whether these systems are existing or future. Evaluate the organization’s capabilities, its good practices, and identify potential opportunities for improvement. Identify all potential consequences to be avoided and mitigated during decision-making.

Develop reasonable and appropriate vulnerability studies for accurate risk assessment. Lear how to execute reasonable and meaningful vulnerability assessment.

Develop a knowledge-based risk assessment methodology on industrial systems complying with the requirements of the ISA/IEC-62443-3-2 standards for the Cyber ​​Risk Assessment (ASSESSMENT) phase. Participate in and/or lead a detailed cyber risk assessment based on realistic consequences. Make good decisions consistently with other industrial risk disciplines.

Develop a clear and effective action plan for risk reduction according to the company’s risk matrix and risk tolerance, while complying with governmental regulations or national standards.

Characteristics of this event ID#55770

  • Language: English
  • Duration: around 10 to 12 hours, depending on student pace.
  • Modality: virtual online self-paced with SME coaching as needed.
  • Study and supplementary material
  • Eligible to take the certification exam in English
  • Join study and experience groups

Crash Course, Practical and Effective!

To ensure an adequate and maximum transfer of knowledge, it is necessary to access certified instructors who have the extensive knowledge and experience, making good use of international standards, regulations, and without vices.

One of the most important objectives to be achieved by the attendees at EN60, is to participate and/or lead industrial cybersecurity risk assessment to take good and sound decisions, to effectively and efficiently mitigate industrial cybersecurity risk, while optimizing time and resources.

You will learn a proven practical methodology to fully comply with ISA/IEC-62443-3-2 standard and harmonize with popular regulations with easy, and no hassle. This course will be held entirely, virtually prerecorded for on-demand, in English at the student own pace.

The course slides and recordings will be available in English within the educational platform. Participants will have access to the course material for an indefinite period of time (minimum one year) with access to a wealth of complementary information.

At the end of the course and as a last activity, the participants will individually carry out an evaluation to obtain the corresponding certificate.

Modality and Schedules

After processing the subscription, the participants will receive the Syllabus by email and additional timely instructions.

A Q&A session to participate in group with the instructor is available. You can also request one-to-one sessions with the instructor to receive personal professional guidance at no additional charge, even after the training event period has ended.

On-Demand with audio and video on the WiseCourses Academic Campus. It contains a practice exam at the end of the training event that will be taken online within our Educational Campus. The training material is not downloadable.

Access to the training material is granted for one year, which can be extended upon request. Participants must have at least one computer and Internet access with a good quality connection (a bandwidth of at least 1 MB).

Important: While, the training event takes place within a certain period of time, the student can complete the training before or after the specific period. Group sessions and chat assistance would not be available outside the specified period.

Students are required to complete all course sections to participate in the evaluation and thus obtain the corresponding Certificate.

While we encourage to complete the training activity with the specified period, the participants will still be able to complete the training event with no limitations.

Professional Certification

All participants who have satisfactorily completed 100% of the EN60 course objectives will be eligible to take the internationally valid EN60 certification exam. Students who have successfully completed the course will be able to take the exam and thus obtain their professional certification.

About the Instructor: Max Kon

Maximillian G. Kon is an engineer in electronics with specialization in telecommunications, industrial automation, and cybersecurity. Co-author of ISA Certificate program (IC32, IC33, IC34, IC37), current official instructor of ISA Training, and CEO of WisePlant Group LLC. He joined the ISA99 committee in 2006 as an SME. Max shares a proven methodology and lots of experience in helping large multinational organizations to protect what really matters.

Maximillian Kon

Details

Venue

  • WiseCourses Campus
  • Virtual e-Learning Platform
    Miami, FL 33130 United States
  • View Venue Website

Organizer

  • WiseCourses LLC
  • Email sales@wisecourses.com