EN50: Industrial cybersecurity management for projects in the energy, oil, and gas sector. (ID#55768)
October 1, 2024 - December 31, 2026
Event Navigation

Participate, manage, and lead the implementation of Industrial Cybersecurity Management Programs (ICMP) at end users organizations and facilities covering the entire lifecycle of one or many IACS/SUC with easy and no hassle.
This program has been designed and developed by WisePlant Group in cooperation with ARPEL, specially tailored (but not limited to) companies in the energy, oil and gas sector. Visit ARPEL to know more about the organization.
Contents of the course
View and download the EN50 Datasheet here

The EN50 course explains all the activities and tasks to be carried out to develop governance for industrial cybersecurity in a company that is starting from scratch or has something already developed. It includes a description of CSMS governance activities, training plan, auditing, compliance, and continuous improvement.
Harmonization with popular energy, oil and gas industries is also described, such as NIST, NERC, TSA, INGAA and others, in order to avoid conflicts or duplication of efforts, while taking advantage of a sound RAGAGEP (Recognized And Globally Accepted Good Engineering Practices) methodology.
The course is ideal for all those in the organization who needs to follow a step-by-step well documented methodology to those who need to manage and lead the implementation of the proven CSMP (Cyber Security Management Program)
All the activities necessary to be carried out to cover the first phase in the cybersecurity life cycle of a given system under consideration are explained. All activities, with their inputs and outputs, to complete the risk assessment and sound decision-making that will mitigate all risks intolerable by the organization.
It then describes all the activities necessary to develop and implement security-by-design, taking the results of the risk assessment as a starting point. Once the design is completed, the activities to be developed to implement the mitigation of all intolerable risks in an effective and efficient way are explained and described.
It then includes a detailed description about all activities and tasks to be performed to assist in the safe operation of the plant are described, including surveillance activities, timely response to events (no false positives), and recovery plans.
All the activities and tasks necessary to keep the systems under consideration within the risk tolerated by the organization are carried out. Including the necessary preventive and corrective maintenance tasks.
All the activities and tasks to be carried out are explained, and the correct sequence is detailed, with its minimum necessary inputs and outputs to be produced as a result of its execution. The methodology minimizes the chances of deviations and errors typical of the industry.
The proven WBS Framework methodology is “Certify Ready” by any authorization of certification, since every piece of information is reported in a normalized manner. Easy to review for compliance and certify.
Characteristics of this event ID#55768
- Language: English.
- Duration: around 8 hours, depending on student pace.
- Modality: virtual online self-paced with SME coaching as needed.
- Study and supplementary material.
- Eligible to take the certification exam in English.
- Join study and experience groups.
Crash Course, Practical and Effective!
To ensure an adequate and maximum transfer of knowledge, it is necessary to access certified instructors who have the extensive knowledge and experience, making good use of international standards, regulations, and without vices.
One of the most important objectives to be achieved by the attendees at EN50, is the correct implementation, to effectively and efficiently mitigate industrial cybersecurity risk, while optimizing time and resources.
You will learn a proven practical methodology to fully comply with ISA/IEC-62443 series of standards and any popular regulations with easy, and no hassle.
This course will be held entirely, virtually prerecorded for on-demand, in English at the student own pace. The course slides and recordings will be available in English within the educational platform.
Participants will have access to the course material for an indefinite period of time (minimum one year) with access to a wealth of complementary information.
At the end of the course and as a last activity, the participants will individually carry out an evaluation to obtain the corresponding certificate.
Modality and Schedules
After processing the subscription, the participants will receive the Syllabus by email and additional timely instructions.
A Q&A session to participate in group with the instructor is available. You can also request one-to-one sessions with the instructor to receive personal professional guidance at no additional charge, even after the training event period has ended.
On-Demand with audio and video on the WiseCourses Academic Campus. It contains a practice exam at the end of the training event that will be taken online within our Educational Campus.
The training material is not downloadable. Access to the training material is granted for one year, which can be extended upon request. Participants must have at least one computer and Internet access with a good quality connection (a bandwidth of at least 1 MB).
Important: While, the training event takes place within a certain period of time, the student can complete the training before or after the specific period. Group sessions and chat assistance would not be available outside the specified period.
Students are required to complete all course sections to participate in the evaluation and thus obtain the corresponding Certificate. Live interactive and networking period runs from Monday, May 6th to Friday, May 10th.
While we encourage to complete the training activity with the specified period, the participants will still be able to complete the training event with no limitations.
Professional Certification
All participants who have satisfactorily completed 100% of the EN50 course objectives will be eligible to take the internationally valid EN50 certification exam. Students who have successfully completed the course will be able to take the exam and thus obtain their professional certification.
About the Instructor: Max Kon
Maximillian G. Kon is an engineer in electronics with specialization in telecommunications, industrial automation, and cybersecurity. Co-author of ISA Certificate program (IC32, IC33, IC34, IC37), current official instructor of ISA Training, and CEO of WisePlant Group LLC. He joined the ISA99 committee in 2006 as an SME. Max shares a proven methodology and lots of experience in helping large multinational organizations to protect what really matters.


Responses